Project details
- Turbine type: Vestas V80
- Capacity: 2 megawatt (MW) per wind turbine. Total installed capacity is therefore 8MW
- Height: 125m to the tip of the blade, measured from original ground level
- Expected annual power output: circa 17 gigawatthour (GWh). The generated electricity will be fed into the local grid network
- Life span: the wind farm is expected to be commissioned by the end of 2023 and will remain operational for up to 20 years
Overview in pictures of construction progress to date